Production / Manufacturing

Work orders from frozen BOQ → BOM & cutting optimisation → shop-floor stages → QC → finished goods, scheduled backward from install dates.

On-time

91%

Wastage

7.6%

WIP value

₹84 L

Utilisation

82%

Overdue WOs

1

QC fails

2

Today’s load · work centres

  • Double-head saw14/16h · 3 jobs
  • CNC router17/16h · 4 jobs
  • Assembly bay 111/16h · 2 jobs
  • Assembly bay 29/16h · 2 jobs
  • Glazing line13/16h · 3 jobs
  • QC bench6/16h · 4 jobs

QC fail feed

  • WO-00495

    Fixed windows

    Glass scratch — panel 12

    Rework
  • WO-00502

    Hinged doors

    Powder-coat orange peel

    Review