Production / Manufacturing
Work orders from frozen BOQ → BOM & cutting optimisation → shop-floor stages → QC → finished goods, scheduled backward from install dates.
On-time
91%
Wastage
7.6%
WIP value
₹84 L
Utilisation
82%
Overdue WOs
1
QC fails
2
Today’s load · work centres
- Double-head saw14/16h · 3 jobs
- CNC router17/16h · 4 jobs
- Assembly bay 111/16h · 2 jobs
- Assembly bay 29/16h · 2 jobs
- Glazing line13/16h · 3 jobs
- QC bench6/16h · 4 jobs
QC fail feed
- WO-00495Rework
Fixed windows
Glass scratch — panel 12
- WO-00502Review
Hinged doors
Powder-coat orange peel