Lifecycle
Items
6
Total cost
₹9.2 L
Total price
₹11.8 L
Margin
22.0%
Paid
₹4.72 L
Outstanding
₹7.08 L
Documents
unlock as the project advancesProduction Drawings
Per-item fabrication & GA drawings
Procurement
Requirement list — profiles, glass & accessories
Packing List
Bar-level pack with colour & serials
Production Cutting List
Optimised floor cut-cards
Delivery Note
Dispatch challan for installation
Drawings
No drawings yet
Production drawings are issued once the project reaches Drawing.
Schedule
- Done
Site survey
Survey crew · 12-Jun-2026
- Not scheduled
Anodising / coating
Coating vendor
- Not scheduled
Dispatch
Logistics
- Not scheduled
Installation
Install crew
- pending
Glass — PO → Scheduled → Received → QC
Project-linked · non-returnable · sized from final measures (SOD11)
Quality & readiness
Quality moduleGate 1 · Post-coating
Passed w/ NotesQCI-0222 · 30-Jun-2026 · 1 defect so far
Shade drift accepted use-as-is (PM)
Gate 2 · Pre-delivery
PendingFabricated units — inspect before dispatch to site
No readiness label yet
The Site Engineer sets a one-time readiness label after the measurement visit.
The site is the client’s responsibility — readiness is tracked only to protect installation dates.
Team
Team not assigned yet
N. Gupta is the accountable PM; the SE, production unit and install crew attach as the project advances.
Architects
No architects linked
Link one or more architects who design or specify this project.
Basic details
- Project #
- PRJ-2026-0233
- Client
- Total Environment
- Project type
- Residential
- Mobile
- —
- Source quotation
- QT-00455-v1
- Project manager
- N. Gupta
Site details
- Address
- —
- Stage
- Packing
- Current vendor
- Coating vendor
- Install crew
- Install crew