Mahindra Lifespaces
Lifecycle
Items
11
Total cost
₹33.7 L
Total price
₹43.2 L
Margin
22.0%
Paid
₹17.28 L
Outstanding
₹25.92 L
Documents
unlock as the project advancesProduction Drawings
Per-item fabrication & GA drawings
Procurement
Requirement list — profiles, glass & accessories
Packing List
Bar-level pack with colour & serials
Production Cutting List
Optimised floor cut-cards
Delivery Note
Dispatch challan for installation
Drawings
- IssuedDRW-M1Block A window schedule
Item 1 · Rev A
Schedule
- Done
Site survey
K. Das · 16-Jun-2026
- Not scheduled
Anodising / coating
Pune Anodisers
- Not scheduled
Dispatch
VRL Logistics
- Not scheduled
Installation
Crew A
- pending
Glass — PO → Scheduled → Received → QC
Project-linked · non-returnable · sized from final measures (SOD11)
Quality & readiness
Quality moduleNo QC gates raised yet — Gate 1 opens when coated material returns from the coater, Gate 2 before dispatch to site. A failed gate blocks forward movement until its defects are dispositioned.
Site readiness
Not ReadyCivil / clearance work pending on the client sideOne-time label · set by J. Thomas · 03-Jul-2026
Facade scaffold not erected; client target 18-Jul.
The site is the client’s responsibility — readiness is tracked only to protect installation dates.
Team
6 open tasks- owns site + production
Project manager
N. Gupta
- reports to PM
Site engineer
J. Thomas
- reports to PM
Production unit
Line 2
Install crew
Crew A
N. Gupta owns both the Site Engineer and the production unit on this project — one accountable owner from drawing to hand-over.
Architects
- Ar. Rohan KappenCommercial
Commercial architect · Kappen & Associates
Basic details
- Project #
- PRJ-2026-0240
- Client
- Mahindra Lifespaces
- Project type
- Commercial
- Mobile
- +91 99020 44781
- Source quotation
- QT-00788-v2
- Project manager
- N. Gupta
Site details
- Address
- Mahindra Splendour, Pune 411014
- Stage
- Drawing
- Current vendor
- Pune Anodisers
- Install crew
- Crew A