PRJ-2026-0242Production Done

Godrej Properties

TypeCommercialQuoteQT-00795-v1PMF. SheikhAddress
Approved
Drawing
Requirement
Packing
On Coating
G1 · PassedQCI-0218 · 24-Jun-2026
On Production
7Production Done
G2 · In QCQCI-0229 · underway
8Pre-Install
9Installation
10Completed

Lifecycle

8/14
Quotation Approved
Sales Order
Project Created
Drawings
Site Verification
Procurement
Coating
Glass
Final Site Visit
Production
Dispatch & Delivery
Installation
Final QC
Warranty Issued
Project Completed

Items

8

Total cost

₹19.6 L

Total price

₹25.2 L

Margin

22.2%

Paid

₹12.6 L

Outstanding

₹12.6 L

Documents

unlock as the project advances

Production Drawings

Per-item fabrication & GA drawings

Ready

Procurement

Requirement list — profiles, glass & accessories

Ready

Packing List

Bar-level pack with colour & serials

Ready

Production Cutting List

Optimised floor cut-cards

Ready

Delivery Note

Dispatch challan for installation

Locked
Ready at Pre-Install

Drawings

0/0 approved

No drawings yet

Production drawings are issued once the project reaches Drawing.

Schedule

  • Site survey

    Survey crew · 12-Jun-2026

    Done
  • Anodising / coating

    Coating vendor · 22-Jun-2026

    Done
  • Dispatch

    Logistics

    Not scheduled
  • Installation

    Install crew

    Not scheduled
  • Glass — PO → Scheduled → Received → QC

    Project-linked · non-returnable · sized from final measures (SOD11)

    done

Quality & readiness

Quality module

Gate 1 · Post-coating

Passed

QCI-0218 · 24-Jun-2026

Gate 2 · Pre-delivery

In Progress

QCI-0229 · 05-Jul-2026 · 1 defect so far

Site readiness

Partially ReadySome zones installable; verify before crew booking

One-time label · set by J. Thomas · 01-Jul-2026

Tower-A openings ready; Tower-B lintel work runs till 12-Jul.

PM re-check before crew booking — none yet

The site is the client’s responsibility — readiness is tracked only to protect installation dates.

  • Project manager

    F. Sheikh

    owns site + production
  • Site engineer

    J. Thomas

    reports to PM
  • Production unit

    Line 2 (F. Sheikh)

    reports to PM
  • Install crew

    Crew A

F. Sheikh owns both the Site Engineer and the production unit on this project — one accountable owner from drawing to hand-over.

Architects

No architects linked

Link one or more architects who design or specify this project.

Basic details

Project #
PRJ-2026-0242
Client
Godrej Properties
Project type
Commercial
Mobile
Source quotation
QT-00795-v1
Project manager
F. Sheikh

Site details

Address
Stage
Production Done
Current vendor
Coating vendor
Install crew
Install crew