Godrej Properties
Lifecycle
Items
8
Total cost
₹19.6 L
Total price
₹25.2 L
Margin
22.2%
Paid
₹12.6 L
Outstanding
₹12.6 L
Documents
unlock as the project advancesProduction Drawings
Per-item fabrication & GA drawings
Procurement
Requirement list — profiles, glass & accessories
Packing List
Bar-level pack with colour & serials
Production Cutting List
Optimised floor cut-cards
Delivery Note
Dispatch challan for installation
Drawings
No drawings yet
Production drawings are issued once the project reaches Drawing.
Schedule
- Done
Site survey
Survey crew · 12-Jun-2026
- Done
Anodising / coating
Coating vendor · 22-Jun-2026
- Not scheduled
Dispatch
Logistics
- Not scheduled
Installation
Install crew
- done
Glass — PO → Scheduled → Received → QC
Project-linked · non-returnable · sized from final measures (SOD11)
Quality & readiness
Quality moduleGate 1 · Post-coating
PassedQCI-0218 · 24-Jun-2026
Gate 2 · Pre-delivery
In ProgressQCI-0229 · 05-Jul-2026 · 1 defect so far
Site readiness
Partially ReadySome zones installable; verify before crew bookingOne-time label · set by J. Thomas · 01-Jul-2026
Tower-A openings ready; Tower-B lintel work runs till 12-Jul.
The site is the client’s responsibility — readiness is tracked only to protect installation dates.
Team
4 open tasks- owns site + production
Project manager
F. Sheikh
- reports to PM
Site engineer
J. Thomas
- reports to PM
Production unit
Line 2 (F. Sheikh)
Install crew
Crew A
F. Sheikh owns both the Site Engineer and the production unit on this project — one accountable owner from drawing to hand-over.
Architects
No architects linked
Link one or more architects who design or specify this project.
Basic details
- Project #
- PRJ-2026-0242
- Client
- Godrej Properties
- Project type
- Commercial
- Mobile
- —
- Source quotation
- QT-00795-v1
- Project manager
- F. Sheikh
Site details
- Address
- —
- Stage
- Production Done
- Current vendor
- Coating vendor
- Install crew
- Install crew