9+
Projects
PRJ-2026-0245Pre-Install

Prestige Group

TypeCommercialQuoteQT-00817-v1PMF. SheikhAddress
Approved
Drawing
Requirement
Packing
On Coating
G1 · PassedQCI-0216 · 20-Jun-2026
On Production
Production Done
G2 · PassedQCI-0226 · 02-Jul-2026
8Pre-Install
9Installation
10Completed

Lifecycle

9/14
Quotation Approved
Sales Order
Project Created
Drawings
Site Verification
Procurement
Coating
Glass
Final Site Visit
Production
Dispatch & Delivery
Installation
Final QC
Warranty Issued
Project Completed

Items

4

Total cost

₹11.85 L

Total price

₹15.2 L

Margin

22.0%

Paid

₹12.16 L

Outstanding

₹3.04 L

Documents

unlock as the project advances

Production Drawings

Per-item fabrication & GA drawings

Ready

Procurement

Requirement list — profiles, glass & accessories

Ready

Packing List

Bar-level pack with colour & serials

Ready

Production Cutting List

Optimised floor cut-cards

Ready

Delivery Note

Dispatch challan for installation

Ready

Drawings

0/0 approved

No drawings yet

Production drawings are issued once the project reaches Drawing.

Schedule

  • Site survey

    Survey crew · 12-Jun-2026

    Done
  • Anodising / coating

    Coating vendor · 22-Jun-2026

    Done
  • Dispatch

    Logistics · 30-Jun-2026

    Scheduled
  • Installation

    Install crew

    Not scheduled
  • Glass — PO → Scheduled → Received → QC

    Project-linked · non-returnable · sized from final measures (SOD11)

    done

Quality & readiness

Quality module

Gate 1 · Post-coating

Passed

QCI-0216 · 20-Jun-2026

Gate 2 · Pre-delivery

Passed

QCI-0226 · 02-Jul-2026

Site readiness

Ready to InstallOpenings finished, access clear — safe to schedule

One-time label · set by J. Thomas · 28-Jun-2026

All openings plastered + cured; service lift available 9–6.

Re-checkReady to InstallJ. Thomas · 04-Jul-2026Re-confirmed with client PM before slot booking.

The site is the client’s responsibility — readiness is tracked only to protect installation dates.

  • Project manager

    F. Sheikh

    owns site + production
  • Site engineer

    J. Thomas

    reports to PM
  • Production unit

    Line 1

    reports to PM
  • Install crew

    Crew B

F. Sheikh owns both the Site Engineer and the production unit on this project — one accountable owner from drawing to hand-over.

Architects

No architects linked

Link one or more architects who design or specify this project.

Basic details

Project #
PRJ-2026-0245
Client
Prestige Group
Project type
Commercial
Mobile
Source quotation
QT-00817-v1
Project manager
F. Sheikh

Site details

Address
Stage
Pre-Install
Current vendor
Coating vendor
Install crew
Install crew